Wednesday, January 23, 2013

We're going to get a few T-shirts made with our logo.  Not sure which one we'll choose?

Friday, January 11, 2013

We spent a long day in the train building today. Lorrie painted back drops for 7.5 hours straight, she's doing a terrific job.  The new "skies" make a huge difference upon entry into the layout building (a certain WOW factor).  Nice job Lorrie!   I worked changing out street lamps to better looking Walther's lamp posts.  We have the second of four turntables installed and more switches wired.  By the end of the weekend, Lorrie should have a huge dent in painting and I hope to have the two large trestle bridges complete.  The sweeping curved hand laid turnout leading to the large trestle is complete and works like a charm!  A little clean up afterwards and then pictures to post!

Thank for stopping by

L&L